The City of Aztec is seeking to construct a second solar field for the purpose of generating electricity.
Phase 1. Land Acquisition
• Completed in 2022.
Phase 2. Road Access
The existing access road to the solar field requires design and improvements.
• Seeking quotes for materials and construction.
Phase 3. Design and Construction
• Final Design completed.
• Feasibility study completed; Interconnection study completed; Facilities study underway.
• Formal engineering of the solar field will be required.
• Funding is being sought. PACE application, state application, and federal applications have been submitted.
Last Updated 5/2/2024