North Main Extension

Phase 1

Phase 1 of the North Main Extension is complete. It involved the installation of utilities (electric, sewer, and water lines), curb and gutter, sidewalks, street paving, landscaping, remote parking area, plaza, and trail to Rio de Animas Park.

Phase 2

Involves some additional infrastructure to North Main. This includes:
  • • Restroom (COMPLETED).
  • 8/15/2024 Installation of sidewalks completed.
    8/7/2024 Installation of vault restroom completed.
    8/6/2024 Excavation of the restroom vault pit has begun.

  • • Hampton Culvert.
  • The crossing of Hampton Canyon Arroyo is in the process of being order.

  • • Lift/Pump Station.
  • Wet well designed for maximum size is in the process of being ordered.
    The pump system will be ordered once development begins.


    Last Updated 8/23/2024
    Restroom
    Restroom project completed.
    2024-08-07a
    Restroom: Vault being installed.