Animas River & Williams Arroyo Bank Stabilization
Animas Riverbank Stabilization
Phase 1 involves the riverbank stabilization of the Animas River at the south pedestrian bridge on the Hartman Park side.
• Project awarded.
• Permit application completed, waiting on Army Corp of Engineer approval.
• August / September construction.
Williams Arroyo
Continued floods and heavy stormwater run-off has begun to erode the arroyo's banks which is undercutting the parking lot sidewalk and YAFL field at Hartman Sports Complex.
Phase 1. Damaged Parking Lot Area
• Permit completed.
• Bid rejected due to over budget; Re-bid to occur.
Phase 2. Arroyo along YAFL Field
• Design underway.
Last Updated 5/2/2024