PROJECTS
Riverside Park
Project 1 was the construction of an entrance monument sign to Riverside Park. This included masonry work on the concrete wall, painting / lettering of upper wall, installation of railroad ties for border, and cobbling the landscape.
Project 2 included construction of 4 ft and 8ft fencing around the new pickle ball court pad (two courts to be developed) and installation of crusher fines around the perimeter of the court between fencing and concrete pad.
Project 3 involved construction of a parking area for the pickle ball and basketball courts. This included post & cabling the perimeter, installation of a picninc table, and spreading gravel for the parking surface.
Alternate 1 consisted of improvements around the outer part of the softball field. This involved bringing fill in to level bleachers and installing post & cabling.