YOUTH CONSERVATION CORPS 2022
CREW
YCC Account Managers
Joni Gay & Alisha Campbell
YCC Project Coordinator
Edward Kotyk
YCC Field Coordinator
Jacob Olguin
YCC Members
Aiden Prentiss
Dayton Jones
Dylan Dansie
Rowdy Anderson
Taner Olguin
Trinity Ferguson
PROJECTS
Project 1. Aztec Disc Golf Course
Add three additional baskets to the 6-hole course. Involves digging holes and mounting the basket post in concrete. T-box frames will be constructed with 2x4s in the size of 4ft x 6ft. Excavate the turf to 3 inches down so that the T-box frames will sit at ground level surface. Fill frames with concrete. Install sign frame for sign panel showing the disc golf course.
Project 2. RV Parking Facilities
Install new post & cabling (560 feet / 28 posts). Install picnic tables (5) and electric pedestals (6).
Alternate 1. Riverside Post & Cabling Improvements
Identify posts that are not capped and install metal caps. Tighten all loose cabling around the park.
Alternate 2. Animal Shelter Dog Park Amenities
Hand excavate water line trench for frost-free faucet. Excavate pit to install 8' metal water trough for holding water. Construct steps to pavilion.
Alternate 3. Rio de Animas Trail Signage
Installation of 3 sign frames and sign panels.